Frequently Asked Questions
Hydroseeding Questions
How much does hydroseeding normally cost around Minneapolis?
Depending on which national guide you read, it runs about $0.06 to $0.35 a square foot. HomeGuide's range for a lawn of 5,000 square feet is roughly $1,000 to $1,750, and it notes that most companies set a minimum job fee of $300 to $500 or more. Grading, topsoil and slopes push the total up, so your yard's quote follows a measurement.
Which month is right for hydroseeding in Minneapolis?
Mid-August to mid-September, per the University of Minnesota Extension. Early spring is the next best for repairs and overseeding. Later in fall, the grass has too little time to root before the ground freezes.
What are the disadvantages of hydroseeding?
It is not an instant lawn. You water lightly several times a day for the first weeks, you stay off it until it is established, and weeds have more of a chance than in sod. Extension says a seeded lawn takes nearly a full season to mature.
Can I hydroseed my own lawn?
Small areas, yes, with a pump sprayer kit or a rented machine. The hard parts are getting the seed and mulch rates even across the yard and preparing the soil properly. For a whole yard, a slope or a lot that needs a city erosion permit, a crew with a full-size machine is usually faster and more consistent.
Does Minneapolis want a permit before I regrade and reseed?
If the work disturbs more than 500 square feet or 5 cubic yards of soil, the city requires an erosion and sediment control permit. Over 5,000 square feet, an approved erosion control plan is required first. We can tell you during the site walk whether your project is likely to cross those lines.
Can a new lawn get phosphorus fertilizer in Minneapolis?
Yes. The city's fertilizer ordinance limits phosphorus but allows it during the first growing season of a new lawn, or when a soil test shows a need. Our starter fertilizer follows that rule.
Is hydroseed or sod better for a steep yard?
Extension notes sod gives immediate cover on slopes and erosion-prone areas, staked in place across the slope. Hydroseed works on slopes too when it goes over a blanket or with extra tackifier and mulch. We look at the grade and the runoff before recommending one.
How soon can we mow and use the lawn?
HomeGuide puts the first mowing at about 4 to 6 weeks after seeding. Keep foot traffic, pets and play off it until then, and expect it to toughen up over the following season.
Residential Lawn Hydroseeding Questions
What is the hydroseeding cost for a typical Minneapolis yard?
Depending on the guide, a lawn of 5,000 square feet runs roughly $350 to $1,750, and companies commonly charge a minimum of $300 to $500 or more per job. Soil prep and topsoil are extra. We give you a figure after measuring.
How long before the grass shows?
Under good conditions hydroseeded grass often shows in 5 to 7 days, but Kentucky bluegrass can take 2 to 3 weeks. Mixes with ryegrass show green sooner while the bluegrass catches up.
Can you seed a lawn in late October?
We usually advise against it. Grass seeded that late has little time to root before the ground freezes. Waiting for spring, or seeding as late as Extension's mid-September window allows, gives better results.
Do I need an irrigation system?
No, but you need a way to water every part of the lawn lightly several times a day for the first weeks. Hoses with timers and sprinklers work. If nobody can water, we will talk about timing or sod.
Will weeds come up in a new hydroseeded lawn?
Some will. Extension notes seeded lawns face more weed pressure than sod. A thick stand of grass and regular mowing crowd most of them out by the end of the first season.
Builder & Commercial Hydroseeding Questions
What do hydroseeding contractors charge per acre?
For typical work, consumer cost guides range from about $2,000 to $4,900 an acre, and some run higher for full-service jobs. Public bids we have seen for a 2023 park project came in near $2,600 to $3,300 per acre. Your site's mix, access and water source set the actual number.
How fast do you need to seed after grading stops?
Under the state construction stormwater permit, stabilization starts immediately when work in an area stops for 14 days and must be finished within 14 days, or 7 days near special or impaired waters. Your plan may set tighter limits.
Can you seed stormwater ponds with native mixes?
Yes. Many pond plans call for native grass or wetland edge mixes rather than turf. We spray whatever mix the plan specifies, often with a heavier mulch rate on the slopes.
Do you seed in November?
Once the ground is frozen, seed does not establish. Late in the season we use mulch, blankets or dormant seeding methods depending on the plan and what the inspector will accept.
Slope Stabilization & Erosion Blankets Questions
What is the difference between a straw blanket and coir?
Straw blankets are lighter and break down faster, which suits moderate slopes. Coir is coconut fiber and lasts longer, so it is better for steep banks and channels.
Is hydromulch enough on a walkout slope?
On short, moderate slopes with no runoff from above, often yes. On long or steep slopes, or where water runs over the top, a blanket or bonded fiber matrix holds better.
Will the blanket have to be pulled up later?
No. Straw and coir rot away on their own. Some products use netting that hangs around longer, so where mowing or wildlife is an issue, ask us for biodegradable netting.
Can you stabilize a lakeshore bank?
We can seed and blanket the upland slope above the shoreline. Work in or below the water line usually needs DNR and watershed district approval, which the owner should check first.
Silt Fence & Sediment Control Questions
When does a Minneapolis project need silt fence?
The city requires an erosion and sediment control permit for disturbance over 500 square feet or 5 cubic yards, and the permit conditions usually call for perimeter control on the downhill side. Your permit or plan says exactly what is needed.
Who is responsible for keeping the fence working?
The permit holder, usually the owner or general contractor. We can do the maintenance for you, but the permit responsibility stays with the holder.
What happens if sediment builds up behind the fence?
Under the state permit, when sediment reaches half the fence height it must be cleaned out or the fence supplemented by the end of the next business day.
Can silt fence go across a driveway or alley?
No, vehicles would destroy it. Openings need a different control, such as a rock construction entrance or a gap protected another way, as the plan specifies.
Do you protect street storm drains?
Yes. We install inlet protection that suits the inlet type and traffic, and remove it when the area draining to it has permanent cover.
Yard Grading & Topsoil Prep Questions
What depth of topsoil should go under new grass?
It depends on what is there now. Where the dark surface layer was stripped, a few inches of topsoil blended into the subsoil makes a big difference for new roots. We check the soil during the site walk and quote a depth.
Water sits next to our house after rain. Can grading fix that?
Often it can. We reshape the yard so it slopes away from the foundation, and add a swale or drain line where needed. If the real problem is the foundation or a sewer line, we will tell you.
Is a permit needed to regrade my yard?
In Minneapolis, if the work disturbs more than 500 square feet or 5 cubic yards of soil, an erosion and sediment control permit is required.
Do you haul away extra dirt?
On small jobs we spread it on site where it helps the grade. Larger amounts can be hauled; that is a separate line on the quote.
Overseeding & Lawn Renovation Questions
How do I know if my lawn needs renovation or just overseeding?
Extension's rule of thumb is renovation when 30 to 50 percent of the lawn is dead, thin, thatchy or weedy. Less than that, overseeding and better care usually do the job.
Can you overseed in spring?
Yes, early spring as the lawn greens up is Extension's second-best time. Late summer is better because seedlings avoid summer heat and weeds.
Why is my lawn thin under the trees?
Usually shade and root competition. Overseeding with a fine fescue mix suited to shade, and raising the mowing height, often helps more than adding fertilizer.
Do I need to stop using the lawn after overseeding?
Keep heavy traffic off the seeded areas through the first few mowings. Extension suggests mowing short for about a month so light can reach the seedlings.